Purcell Construction Corp., based in Watertown, NY, won the Design-Build contract for a four-story dorm to be built at SUNY Brockport. By using the Design-Build Delivery Method the University expects to save at least $8 Million in construction costs. According to an article posted by the Rochester Democrat and Chronicle on March 24th, the 256-bed dormitory is projected to cost $23.8 million, with $21 million going for construction and the rest for administrative-related costs for this project. Construction will begin in May of this year and be completed in the summer of 2018. Read More